RIGOL RSA808 8.5 GHz, Real-Time Spectrum Analyser with Tracking Generator

£2,999.00 (£3,598.80 inc. VAT)

1 in stock (can be backordered)

Availability: Stock models delivered next working day (UK only) for orders placed before 16:30 (Mon - Fri)

Compare with other Rigol RSA800 Series Spectrum Analysers

SKUImageFrequencyRBWPhase NoisesDANLPre-AmplifierTracking GenStockPrice
RSA808Low stockImage of Rsa800 with rf telonicuk5 kHz–8.5 GHz1 Hz–10 MHz−112 dBc/Hz typ.−168 dBm typ.StandardYes1£2,999.00
RSA804Image of Rsa800 with rf telonicuk5 kHz–4.5 GHz1 Hz–10 MHz−112 dBc/Hz typ.−168 dBm typ.StandardYes5+£1,629.00
RSA814Low stockImage of Rsa800 with rf telonicuk5 kHz–14 GHz1 Hz–10 MHz−112 dBc/Hz typ.−168 dBm typ.StandardYes2£4,729.00

Description


RIGOL RSA808 8.5 GHz, Real-Time Spectrum Analyser with Tracking Generator

The RSA808, Part of the RIGOL RSA800 Series, combines high-performance spectrum analysis with powerful real-time signal capture in a compact, portable platform. Covering frequencies from 5 kHz to 4.5 GHz, 8.5 GHz or 14 GHz, the RSA800 supports traditional swept spectrum analysis, real-time spectrum analysis, vector signal analysis, EMI pre-compliance testing and analogue demodulation, making it suitable for a wide range of RF development, validation and troubleshooting applications.

With excellent phase noise performance, low displayed average noise level (DANL), up to 40 MHz real-time bandwidth, a built-in tracking generator and optional advanced RF measurement packages, the RSA800 delivers laboratory-grade capability in an instrument weighing just 1.9 kg. Designed for both bench and field use, it also supports USB-C power bank operation, making high-performance RF analysis more accessible than ever.

Features
  • Frequency coverage from 5 kHz to 4.5 GHz, 8.5 GHz or 14 GHz
  • Five measurement modes: GPSA, RTSA, VSA, EMI and ADM
  • 40 MHz real-time analysis bandwidth with 100% POI down to 5.62 μs
  • Excellent DANL down to -168 dBm/Hz (typ.) with preamplifier enabled
  • Low phase noise performance with -112 dBc/Hz (typ.) at 10 kHz offset (1 GHz)
  • Built-in tracking generator as standard
  • Optional Phase Noise, EMI, VSA, ADM and Advanced Measurement software packages
  • Compact 1.9 kg portable design with 7-inch HD capacitive touchscreen
  • USB, LAN and HDMI connectivity with SCPI remote control support
  • USB-C power input with support for portable power banks
Applications
  • RF circuit design and verification
  • Wireless communications testing
  • IoT and embedded RF development
  • EMI pre-compliance testing
  • Spectrum monitoring and interference hunting
  • Digital modulation analysis and signal quality measurement
  • Production and manufacturing test
  • Field service and maintenance

Product Images

Capture short-duration and intermittent signals with up to 40 MHz real-time bandwidth, 199,804 FFTs per second, and 100% Probability of Intercept (POI) down to 5.62 μs. Density displays, spectrograms and persistence views make it easy to analyse transient RF events that conventional swept analysers can miss.
The RSA800 combines GPSA, RTSA, Vector Signal Analysis (VSA), EMI pre-compliance testing and Analog Demodulation (ADM) within a single portable instrument. This versatile platform reduces the need for multiple test instruments while supporting everything from RF development to EMC troubleshooting.
Evaluate modern communication signals using built-in Vector Signal Analysis with support for QPSK, PSK, FSK, ASK and QAM formats up to 1024QAM. Detailed EVM, constellation, spectrum and error measurements simplify verification of wireless devices and communication systems.
Optional application packages provide advanced RF measurements including Occupied Bandwidth (OBW), Adjacent Channel Power (ACP), Carrier-to-Noise Ratio (C/N), Phase Noise, Analog Demodulation and EMI pre-compliance testing, enabling the RSA800 to adapt to a wide variety of RF measurement tasks.
Weighing just 1.9 kg, the RSA800 features a 7-inch HD touchscreen, USB, LAN and HDMI connectivity, built-in tracking generator, SCPI remote control support and even power bank compatibility via USB-C, making it equally suited to laboratory benches, production environments and field engineers.

Product Videos

Documentation

Model RSA804 RSA808 RSA814
Frequency Range 5 kHz to 4.5 GHz 5 kHz to 8.5 GHz 5 kHz to 14 GHz
Amplitude Range DANL to +20 dBm
1 GHz Phase Noise 10 kHz offset, <-110 dBc/Hz, -112 dBc/Hz (typ.)
1 GHz DANL normalised to 1 Hz -145 dBm (typ.) with PA off
-168 dBm (typ.) with PA on
RBW 1 Hz to 10 MHz
VBW 1 Hz to 10 MHz
Third-order Intercept (TOI) 1GHz +20 dBm (typ.)
Max. Analysis Bandwidth 40 MHz
Max. Real-Time Bandwidth 40 MHz
Measurement Functions GPSA, RTSA, VSA, EMI, ADM, PNOISE
Tracking Generator Output Power – 40dBm to +0dBm
Appearance and Dimensions 265.35 mm (W) × 161.75 mm (H) × 77.38 mm (D)
I/O LAN, USB, HDMI
Screen 7-inch 1024×600 HD touch display
Programming Control Instruction Sets Support standard SCPI instruction sets

Mandatory Accessories …

  • Image of Power cord

    UK Power Cord

    .
    Read more

Optional Accessories …